Saturday, January 23, 2010

Day 18


I went hunting for a few days and am back. Today I sanded the pontoons, glued the floor in, cut an glued the transom, cut and glued the bow, and cut the front storage hatch.

The picture is of the bow. I still need to fillet and fiberglass tape all of it.
You can see the transom in the back. It is a total of 19" tall for the splash rails. The angles are 45 degree and it is 18" wide at the bottom and 15" from floor for a short shaft motor.


Picture is of the bow storage hatch opening. The rails are 4" from the sides and 2" from the top and bottom. It has been routered with a 1/2" round over bit. The front piece of the bow is 4" tall. I also spent some time refilling the areas of the pontoons and the connections between the transom/floor and the bow/floor pieces with an epoxy/sawdust mixture.

No comments:

Post a Comment